Hi Priti,
thank for you responds.
In my project we are using 16 UoM for all the UoM we have used same ISO code and one primary code.
now the problem is when I create SO in CRM with MD and PC UoM two line item, after replicating into ERP the line item UoM it will become MD become a PC because we have maintained the Primary code for PC.
is there any problem for interface if we remove for PC primary code in both system CRM and ERP.
Thanks,
preddy